Monitoring and evaluation of CDM projects

Student name: Mr Kranav Sharma
Guide: Dr Arun Kansal
Year of completion: 2014
Host Organisation: SENES Consultants India Pvt. Ltd.
Supervisor (Host Organisation): Mr Sumit Barat
Abstract: The internship period spanning six months involved monitoring and further evaluation of two registered CDM projects namely “Energy Efficiency measures in DMRC Phase II stations” and “First Solar PoA in India by SENES Consultants”. For the first project Voluntary Emission Reductions (VERs) for two years 2012 and 2013 were calculated while for the second project post registration Certified Emission Reductions (CERs) were calculated from a period starting from commissioning to now. As per calculations, the first project resulted in a total of 12,788 tCO2e which is 9.6% less than the estimated emission reductions in registered PDD (14142 tCO2e) for the same period. However the project still shows a high degree of energy conservation by being 30% less energy consuming than the phase 1 counterparts. So, the energy efficiency measures employed by the DMRC have performed exceptionally well.

The Solar PoA project (project 2) is a renewable energy CDM project which (as per this thesis) consisted of 26 solar PV plants located across India. The operation of the project resulted in total production of 69413 MWh of clean, renewable electricity and thus subsequently 63992 CERs in total were generated.

Overall the two CDM projects resulted in 82201 ton of CO2 reduction and contributed greatly to environmental conservation and positively influenced sustainability.