Project Overview: India's net-zero target of 2070 rests on an ambitious clean-energy transition — 500 GW of non-fossil capacity by 2030 — yet this scale of renewable integration exposes the power system to critical grid stability risks. The intermittency of solar and wind generation, combined with India's characteristically low grid inertia and pronounced monsoon-driven seasonal variability, creates frequency regulation and peak-load management challenges that existing infrastructure is ill-equipped to handle. Compounding the technical challenge is an institutional one: financially stressed Distribution Companies (DISCOMs) lack the investment capacity to deploy the flexibility resources the grid increasingly demands.
Research Focus: Battery Energy Storage Systems (BESS) have demonstrated considerable potential worldwide for frequency regulation, renewable output smoothing, and peak-load management. This study investigates the optimal deployment of renewable-linked BESS within the Indian power system context. Using a GAMS-based optimisation framework, the research models deployment scenarios that improve frequency stability, reduce curtailment of variable renewable energy, and manage peak demand — providing a rigorous, India-specific analytical foundation that existing global studies do not adequately address.